arch1101_Ben Chen
Monday, 29 June 2015
Glass House incorporates an open plan learning and work ethic, encouraging intra-spatial interaction.
This can be seen in the minimal use of wall structures, rejecting the modern axiom that architecture needs to be physically erected in order to exist. Instead, through changes in volumes, a change in purpose of each 'room' is suggested.
Further compounding this suggestion is the change in natural lighting that can be seen whilst transversing the bridge structure between Tyree and the Square House, providing a comfortable work environment with appropriate levels of lighting.
As a result of the lack of boundaries, a truly multipurpose and yet specific space is born; The Glass House.
![]() |
Staff office/meeting space |
![]() |
General assembly/student meeting space |
![]() |
Block House entry point/Gallery floor |
![]() |
Student study/lounge/gathering space |
![]() |
an open studio space |
![]() |
Study/tutorial space nestled in amongst the library shelves |
![]() |
Space to sit and soak up the sun, encouraging architecture interaction; whilst above sliding panels provide programmable shade for students within |
![]() |
General Staff Office space |
![]() |
Computer lab, and beyond, the programmable shade element. |
EDIT: P.S. Because the Underground sections are hidden in Lumion, please look closely at the Sketchup model in the area connecting to the Blockhouse to see the complete Gallery Floor as well as the underground lecture theater.
Sunday, 28 June 2015
the hidden underground world
to my great irritation and dissatisfaction, I've discovered that Lumion in all its glory, is unable to sufficiently render an underground basement level with my current understanding of it. As such, I find myself unable to present an intended secondary element as intended.
Originally, an expanding elevator, able to restructure itself across different floors was planned between the entry point, mezzanine level and the lower Theatre floor. However, as the lower floor is impossible to access on Lumion there is a loss in drama of the elevator as it travels between floors.
Originally, an expanding elevator, able to restructure itself across different floors was planned between the entry point, mezzanine level and the lower Theatre floor. However, as the lower floor is impossible to access on Lumion there is a loss in drama of the elevator as it travels between floors.
Mezza
View of the lower floor
Grass intrudes into the gallery/exhibition space, under which is another Lecture Theatre Level
Entry Point
Saturday, 27 June 2015
Progess Pics
Progressive elements of the new UNSW Architecture and Built Environment Building
1. Ramp System in foyer; 2,3. North Wing; 4. Louvred South Wing as seen from Anzac Pde. 5. South Wing as seen from Main Walkway; 6,7,8. Interior, South Wing; 9. INT, North Wing; 10. EXT North Wing
Subscribe to:
Posts (Atom)